WhatsApp +60 11-5197 8879 Plan your route

Government website development in Malaysia

We build websites and systems for public agencies in Bahasa Malaysia and English. A purchase order is accepted and billing follows four milestones. Projects from RM30,000.

The plain answer.

KLCube Network builds public-facing websites and internal systems for Malaysian government and public-sector bodies. Each page exists in Bahasa Malaysia and English, is designed for the phone first, and is built with WCAG 2.2 AA as the target.

The founder, Zahid Aramai, leads every project. We have delivered government and GLC work. We do not name those organisations on this site.

What you have to solve.

  • A procurement file that has to hold up

    Someone will read your choice of vendor long after you have made it. You need a registered supplier, a written scope, named milestones and a purchase order that matches them. We provide each in writing before work starts.

  • Bahasa Malaysia is not an afterthought

    Public-sector documents are written in Bahasa Malaysia. A site that translates only the menu fails the citizen who reads it. We write both languages as full pages, with the same facts in each.

  • A site everyone has to be able to use

    Citizens arrive on phones, older devices and assistive technology. We design the phone page first, test the desktop page as its own composition, and work to WCAG 2.2 AA.

  • Forms that collect personal data

    An enquiry or registration form holds names and contact details. We collect only what the form needs, show the notice beside the button and treat consent as a choice.

Work delivered

The one public project we can show that is connected to the public sector is H2Malaysia. Other government and GLC work has been delivered and is not named here.

H2Malaysia is the national hydrogen industry alliance, with NanoMalaysia Berhad as its secretariat. No ministry, agency or GLC is named on this site.

All projects

References the work follows.

These are references and targets. None of them is a certification, and KLCube Network claims none.

  • PKPA Bil. 2/2015

    The circular on the management of public-sector agency websites. We use it as a reference for what an agency site carries and how it is kept. Your own officers confirm what your agency requires; list it in the brief.

  • MYDS, the Malaysia Government Design System

    Published at design.digital.gov.my. We use it as a reference for patterns and accessibility. If your agency must use MYDS components, say so in the brief and we will scope it.

  • PDPA 2010 and its 2024 amendment

    The Personal Data Protection Act governs every form and record on the site. How we handle it is described in the trust centre under data protection.

  • WCAG 2.2 AA as the target

    A target, not a certificate. One of our own launch sites, SDIP, measured accessibility 100 and performance 100. A score is not a conformance statement, and we do not present it as one.

Answers for your procurement file.

  • Do you accept a purchase order?

    Yes. A purchase order is accepted. Projects above RM30,000 are billed in four milestones: 20% blueprint and design, 30% core development, 30% feature completion and 20% UAT and go-live.

  • Are you registered with MOF or on ePerolehan?

    No. KLCUBE NETWORK Enterprise is registered with SSM, number 201603293248 (002580717-P). We hold no MOF registration and no ePerolehan registration. If your procurement requires either, say so in the brief, before either of us spends time on a proposal.

  • How long is a proposal valid, and how are changes handled?

    A written proposal is valid for 30 days. Work outside the agreed scope is quoted and approved in writing before it starts.

  • Who will we deal with?

    Zahid Aramai leads every project and brings in vetted specialists as each project needs. We reply within 8 working hours.

Doing business with us

Questions buyers ask.

Do you build in Bahasa Malaysia?

Yes. Every page we build exists in Bahasa Malaysia and English, with the same facts in both. Bahasa Malaysia is written for a Malaysian reader, not translated word for word.

Can you work to WCAG 2.2 AA?

We work to it as the target and test pages at phone, tablet and desktop widths. We do not claim certification. If your agency needs an independent accessibility audit, say so in the brief.

Can you name the agencies you have worked with?

Not on this site. We have delivered government and GLC work and do not name it here. The public project connected to the public sector that we can show is H2Malaysia.

What is the smallest project you take?

Projects start from RM30,000. For a smaller website, the founder's freelance practice at zahidaramai.com takes work from RM2,500.

Do you work with agencies outside Kuala Lumpur?

We are based in Kuala Lumpur and work with clients across Malaysia. Meetings, reviews and handover are arranged to suit your agency.

Send a brief for your agency.

Say what the site or system must do, who uses it and when it must go live. If your procurement needs a registration we do not hold, say so.

What happens next

  1. You send a brief, or a message on WhatsApp.
  2. We reply within 8 working hours with questions or a time to talk.
  3. You receive a written proposal with scope, milestones and price. It is valid for 30 days.
WhatsApp Start a brief